Harmer Building Drainage, part of Alumasc Water Management Solutions, has been specified for the luxury apartments at Chelsea Bridge in Battersea. The project is the latest phase of Battersea Park Development, Vista. It is a landmark development, designed by Scott Brownrigg and built by Berkeley Homes, consisting of 1, 2, and 3 bedroom apartments, with the remaining properties ranging from £895,000 to £1.910 million – and they are selling fast. There is extensive outdoor landscaping and each group of apartments benefit from feature terraces and private balconies so they can take advantage of spectacular views over Battersea Park and towards the River Thames.

project images

With the emphasis on outdoor living it’s essential to manage water run-off efficiently, unobtrusively and sustainably. That’s why Harmer’s high capacity, lightweight, aluminium balcony outlets were chosen to provide drainage for over 6km of balconies. Harmer’s Modulock channel drainage was also specified, ideal for controlling, containing and slowly releasing excess water to the rainwater outlet.

Harmer’s expertise and existing relationship with Architects Scott Brownrigg and Berkeley Homes were major factors in winning the contract. Both were aware Harmer could supply a high-end product in an achievable lead time. Constant open dialogue with all parties helped get the project off to a smooth start. Accurate specification, with Harmer’s in-depth knowledge of products and issues, and close involvement at every stage, means any challenges during the project are quickly rectified. The development is due for completion in 2018.